Browse Items (17 total)

  • Tags: construction

Council_Bluffs_Schools_Eastside_Junior_High_08_12_1966_007.jpg
All That Remains...of west wall of Eastside addition gymnasium now under construction is pile of cement block rubble. Job superintendent would not speculate on cause of collapse. photo was taken immediately after collapse by a Nonpareil reporter…

Broadway Viaduct
(Includes one clip/pic on "Viaduct Park"
Officially opened 8/17/55

Broadway_Viaduct_7_1955_006.jpg
aerial photo of Broadway Viaduct, with concrete at 8th Street yet to be poured.

Broadway_Viaduct_3_2_1955_005.jpg
Activity Buzzes...on Broadway Viaduct as carpenters and steel workers prepare for concrete work on west end of the span.,

Broadway_Viaduct_10_10_1954_004.jpg
view of the side of the Broadway viaduct, showing concrete support tiers and structural steel.

Broadway_Viaduct_9_29_1954_003.jpg
The Broadway Viaduct..stretches from Eighth to Fifteenth Sts. as contractors prepare to set the structural steel of the two-million dollar project. Except for the structural steel work, the west approach ramp (bottom) is the only major part of the…

Bridge, Spring Street (I-80)
Across Missouri River between C.B. and Omaha
Earlier items in 'Bridge Sites" file

Bridge_Spring_Street_12_16_1972_006.jpg
Symbolic Linking...of the two states is performed by Nebraska Gov. J.J. Exon, William Gray, chairman of the Iowa Highway Commission, and Council Bluffs Mayor Joseph B. Katelman.

Bridge_Spring_Street_12_10_1972_005.jpg
photo of Spring Street bridge of I-80, looking west

Bridge_Spring_Street_3_7_1971_003.jpg
With five of the 11 piers for the new Interstate 80 Highway completed, and work on the other six piers well along in varying stages, crews for the Jensen Construction Co. of Des Moines have lost no time from weather this past year. Looking toward…

Bridge_Spring_Street_5_8_1970_001.jpg
Delta piers for Spring Street Bridge are taking shape as the reinforcing steel fans out on the number 11 pier on the Iowa side of the river. Grading for the Nebraska approach can be seen in upper background. The substructure is scheduled for…

Bethany_Lutheran_Home_4_27_1975_11.jpg
Chatting With Electricians...inside a nursing station on the first floor of he new Bethany Home is administrator, Mel Fickenscher. A painter is adding the last coat of paint to the entryway.

Bethany_Lutheran_Home_1_14_1975_10.jpg
The Exterior Of Bethany Lutheran Home...takes shape at Elliott Street and North Broadway. Construction workers have now moved inside of the building and are eyeing an early spring completion of the facility. The light-colored concrete structure is…

Bethany_Lutheran_Home_10_6_1974_08.jpg
Work Is Underway...to enclose the Bethany Lutheran Nursing Home at Elliott Street and North Broadway, before winter weather halts outdoor construction work.

Bethany_Lutheran_Home_3_2_1974_06.jpg
Concrete is being poured to form the foundation of the new Bethany Lutheran Home at Elliott Street and North Broadway.
Architect Don Mullins of Wilscom and Mullins, said the building supplies will arrive at the site within a few weeks. With…

Bethany_Lutheran_Home_8_8_1971_02.jpg
Inspecting The Site...of the New Bethany Lutheran Home are Harvey Saar, vice president of the Bethany board; Robert Hegland, fund drive coordinator; Ed Lynn, Jennie Edmundson Hospital Administrator; Don Steege, attorney; Ed Spetman, president of the…
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2