Browse Items (4 total)

  • Tags: American Steel Foundries

Griffin_Pipe1_05_23_1961_001.jpg
From Control Room . . . Griffin Pipe plant operations manager O.L. Dean, right, explains casting operations to American Steel Foundries President J.B. Lanterman, left; C.E. Grigsby, ASF vice president, and Frank W. Jenks, ASF board member and…

Griffin_Pipe1_03_23_1960_004.jpg
Red-Hot 20-Foot Length . . . of pipe is pulled from one of the three centrifugal casting machines. By pressing three buttons on an electronic control panel, a workman can turn out the pipe, extract it from the casting machine and send it to the…

Griffin_Pipe1_01_21_1960_001.jpg
Progress Toward Target Date . . . is reported by Sam C. Prest, Ross Drever, Goff Smith, Robert W. Turner and Orris Dean.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2