white frame building with alcove and double doors at top of concrete block steps; sign in front reads: Church of Christ to Build Here.
On back of photo: 27th Ave & So. 8th St.
Built in 1954
Ch of Christ
[ as of 2023, building still stands as…
This Architectural Drawing...is the proposed Twin City Baptist Church to be built on Renner Drive in Twin City Plaza. Construction is expected to begin within the next few weeks.
An arched roof section of the new First Christian Church educational unit is hoisted into place by a crane Friday. The roof ties into an arch at the front entrance. Each pre-cast, barrel vaulted section weighs 32,000 pounds. The $350,000 project,…
Second Phase...of construction at Community Church of the Nazarene is nearing completion. The Rev. Arlus Edwards is standing on the front sidewalk of his church.
First Assembly of God Church has completed exterior work on its $30,000 revamping project. The modernistic designed entrance and annex is a transposition of the former parsonage - only the base of the house remains - the roof and all existing walls…
Presenting The Plaque . . . to Rev. John Crosswhite is Dr. Norman Vincent Peale. the plaque, symbolic of the Hastings United Methodist Church's winning the 1979 Award from Guideposts Magazine, is engraved with the words: "Presented to the…
New Educational Unit - This buff-brick educational unit will be dedicated by the First Presbyterian Church next Sunday, Sept. 18. It will be open for public inspection from 2:30 p.m. to 5:30 p.m. The new unit, costing about $225,000, faces on Willow…
The Rev. Richard Wagner, pastor at St. Patrick's Catholic Church, adds another grocery sack with food for The Feed 5000 Project to those already in the vestibule of the church.
City Annual Reports
3/22/1956
4/2/1958
4/29/1959
5/60
(6/12/60 -- Clipping "City Pay is Below State Average")
1961 -- City report was in form of films slides/strip
4/15/1962
1962
1971 (Sept. 12) Supplement to Nonpareil "Toward a Better…