With the WPA working a twelve-hour shift to complete driving of piles on the city hall project within the next fifteen to twenty days, workmen are preparing forms for the foundation concrete. This picture, taken from the fifth floor of the Park…
Today...you would never know the creek still existed from this view at Ninth Street. The creek channel is encased in concrete through the main part of the city., And its top is used as street. [sic] The creek project was complete as a WPA project…
Today...the same location is minus the bridge. A lower bridge across the old street car cut has been built and removed. In WPA days the deep cut was filled, banks sloped, and landscaped, and just last year paving was laid through the drive.