Browse Items (9140 total)

Sandbags along the levee in Council Bluffs

Aerial view of a secondary levee, one-half mile below the primary North levee in Council Bluffs. It is 1.75 miles long, built over 28 sets of railroad tracks and was constructed in just 2.5 days.

Sandbags and lumber along the Missouri River

Army trucks and sand trucks on the street

Sandbags in Bayliss Park

Campers in a local stadium

A barge on the Missouri River

Engineers survey the levee along the Missouri River

Reading about the Missouri River flood
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2